[1]
L. Svirska, “Serviceability restoration of operating fastening elements of the high pressure cylinder body of hpp steam turbines: https://doi.org/10.33108/visnyk_tntu2019.01.032”, Visnyk TNTU, vol. 93, no. 1, pp. 32–40, Apr. 2019, doi: 10.33108/visnyk_tntu2019.01.032.