Estimation of the pipelines working capacity basing on the results of semimode testing https://doi.org/10.33108/visnyk_tntu2018.02.039
Main Article Content
Abstract
Analysis of the state of arts of estimation the pipelines operation capacity in Ukraine and other countries taking advantage of the technology of pipeline pigging and integrity management (PPIM аnd ILI technology) has been carried out. Basing on the results of semimodel testing, some aspects of estimation of defects
of pipe metal are considered. The load-bearing capacity of a segment of a pipeline with elastic-plastic deformation, which had been detected during the inside-pipeline diagnostics of a long-time operating gas pipeline of the outer diameter 1220 mm has been experimentally investigated. The paper presents some particularities of experimental estimation of the pipeline segment strength in zones of local plastic deformation. The stress-strain state of locally plastically deformed segments of the pipeline has been determined using the semimodel testing. Basing on the
investigations, recommendations for engineering practice are proposed.
Article Details
Issue
Section

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
1. SOU 60.3-30019801-006.2004. Standart orhanizatsii Ukrainy: Haluzeva systema diahnostychnoho obsluhovuvania obladnania mahistralnykh hazoprovodiv ta AHNKS. – K.: DK „Ukrtranshaz”, 2004. 178 p. [In Ukrainian].
2. Banakhevych Yu.V., Banakhevych R.Yu. Dosvid identyfikatsii vyiavlenykh defektiv vnutrishnotrubnoiu diahnostykoiu v DK „Ukrtranshaz”, Tekhnicheskaia diagnostika i nerazrushayushchiy control, no. 2, 2013, pp. 40 – 46 [In Ukrainian].
3. SOU 60.3-30019801-067.2009. Standart orhanizatsii Ukrainy: Mahistralni hazoprovody. Otsinka faktychnoho tekhnichnoho stanu potentsiino nebezpechnykh dilnyts. Metody i metodyky. – K.: DK „Ukrtranshaz”, 2009. 188 p. [In Ukrainian].
4. DSTU–NBV.2.3–21:2008. Vyznachennia zalyshkovoi mitsnosti mahistralnykh truboprovodiv z defektamy. – Kyiv: Minrehionbud Ukrainy, 2008. 88 p. [In Ukrainian].
5. ASME B31G. American Society of Mechanical Engineers. Manual for determining the remaining strength of corroded pipelines. New York. 1991.
6. Savula S.F., Banakhevych Yu.V., Oliinyk I.Ya., Bakaiev O.Ya. Rezultaty vnutrishnotrubnoi diahnostyky MH (Komarno-derzhkordon Ukrainy-Respublika Polshcha). Informatsiinyi ohliad DK Ukrtranshaz. Vol. 42, no. 6, 2006, pp. 17 – 19 [In Ukrainian].
7. Soloviov O.B. Provedennia vnutritrubnoi diahnostyky prykordonnykh dilnyts mahistralnykh hazoprovodiv Sumskoho LVUMH MH „Kyivtranshaz”. Pidvyshchennia nadiinosti ta efektyvnosti roboty liniinoi chastyny mahistralnykh hazoprovodiv hazotransportnoi systemy DK „Ukrtranshaz”. Kyiv: DK „Ukrtranshaz”, NVTS „Tekhdiahaz”, 2012, pp. 86 – 92 [In Ukrainian].
8. STP 320.30019801.052-2002. Standart pidpryiemstva: Mahistralni hazoprovody. Propuskannia vnutrishnotrubnykh zasobiv na dilnytsi hazoprovodu. K.: DK „Ukrtranshaz”, 2009. 40 p. [In Ukrainian].
9. STP 320.30019801.066-2002. Standart pidpryiemstva: Mahistralni hazoprovody. Vnutrishnotrubne obstezhennia liniinoi chastyny. K.: DK „Ukrtranshaz”, 2010. 21 p. [In Ukrainian].
10. Polozhennia pro analiz vnutrishnotrubnoi diahnostyky mahistralnykh hazoprovodiv DK „Ukrtranshaz” ta orhanizatsiiu vykonannia remontnykh robit z usunennia defektiv. DK „Ukrtranshaz”. Kyiv, 2009. 31 p.
11. Nonemaker J., Steinvoorte T., Subramanian R. Planting the Flags. // Pipelines international. Issue 34. 2017. Pp. 18 – 20.
12. O’Brian J., Moran S., Kirkwood M. Impact of crack profiles on pipeline integrity: advancing assessments with new ILI capabilities system // Pipelines international. Issue 32. 2017. Pp. 22 – 25.
13.Barbian A., Beller M., Thielager N., Willems H. A new in-line inspection tool for the quantitave wall-thickness measurement of gas pipelines: first results.// International conference “Pipeline Technology 2009”. (October, 11 – 14, 2009, Ostend, Belgium). 2009. Pp. 305 – 306.
14. Dubovoi Ye.V., Okhrimchuk S.O. Problemy provedennia diahnostyky i neruinivnoho kontroliu mahistralnykh hazoprovodiv v protsesi ekspluatatsii. Pidvyshchennia nadiinosti ta efektyvnosti roboty liniinoi chastyny mahistralnykh hazoprovodiv hazotransportnoi systemy DK „Ukrtranshaz”. Kyiv: DK „Ukrtranshaz”, NVTS „Tekhdiahaz”. 2012. Pp. 14 – 18. [In Ukrainian].
15. Lokhman I.V., Banakhevych Yu.V., Drohomyretskyi M.M. ta in. Vyznachennia mozhlyvosti i umov propusku diahnostychnykh porshniv na diliantsi vantovoho perekhodu. Truboprovidnyi transport. Spets. vyp. „Aktualni problemy tekhnichnoho diahnostuvannia truboprovodiv i tekhnolohichnoho obladnannia na nykh”. 2008, pp. 38 – 43 [In Ukrainian].
16. Tesliuk V.M., Kharchenko L.Ye. Matymatychne modeliuvannia zhynnykh kolyvan priamoliniinoi dilianky truboprovodu pid diieiu rukhomoho diahnostychnoho porshnia. Modeliuvannia ta informatsiini tekhnolohii: Zbirnyk naukovykh prats. Vyp. 69. Kyiv: Instytut problem modeliuvannia v enerhetytsi im. H.Ye. Pukhova NAN Ukrainy. 2013, pp. 126 – 135 [In Ukrainian].
17. Kharchenko L. Fluctuation of multi-section aboveground pipeline region under the influence of moving diagnostic piston / Lidiya Kharchenko, Yevhen Kharchenko// Vibration in Physical Systems. V. 26. Poznan: Poznan University of technology, 2014. Pp.105 – 112.
18. Oryniak I.V., Lokhman I.V. Nekruhlist formy truby ta ii vplyv na napruzhenyi stan pry navantazhenni vnutrishnim tyskom. Pidvyshchennia nadiinosti ta efektyvnosti roboty liniinoi chastyny mahistralnykh hazoprovodiv hazotransportnoi systemy: zbirnyk dopovidei (Yaremche, 2012) DK „Ukrtranshaz”. 2012, pp. 3 – 13 [In Ukrainian].
19. Enrique Acuna C. Minimising threats and maximising safety: an integrity management system // Pipelines international. Issue 34. 2017. Pp. 38 – 40.
20. Oryniak I.V., Shlapak L.S. Otsenka predelnogo davleniia truby s vmiatinoy. Problemy prochnosti. 2001, no. 5, pp. 101 – 110 [In Russian].
21. Marushchak P.O., Bishchak R.T., Danyliuk I.M. Trishchynostiikist materialiv i konstruktsii: tryvaloekspluatovani mahistralni hazoprovody. Ternopil: “ZAZAPRINT”. 2016, 184 p. [In Ukrainian].
22. Alexander Chris, Evaluating damage to on – and offshore pipelines using data acquired using ILI. // Journal of pipeline engineering. Vol. 8, №1 First Quarter. 2009, pp. 35 – 46.
23. Savula S.F., Banakhevych Yu.V., Drahiliev A.V., Kychma A.O. Opyt primeneniia elektromagnitnogo markirovaniia pri provedenii vnutritrubnoy diagnostiki gazoprovodov v UMG „Lvovtransgaz”. Materialy XIII Mezhdunarodnoy delovoy vstrechi „Diagnostika 2003” „Malta”. 2003. Tom 3. Chast 1. Pp. 70 – 74 [In Ukrainian].
24. SOU 60.3-30019801-007:2004. Standart orhanizatsii Ukrainy: Mahistralni hazoprovody. Neruinivnyi control pry kapitalnomu remonti. K.: DK „Ukrtranshaz”, 2004. 54 p. [In Ukrainian].